Field Development Planning and Processes Optimization
Creation of Field Development Planning (FDP) document, hydrocarbon reserves estimation, selection of geotechnical measures to control field development and reach target levels of production, reservoir pore pressure maintenance and well scheme optimization, accounting for geomechanical effects when producing/injecting – requires integration of various domains and expertise, collaborative approach within the team to resolve complex tasks for reservoir development at any stage of the field life cycle.
STANDARD | ADVANCED | COMPLEX |
---|---|---|
|
|
|
Development of non-traditional reservoirs
Comprehensive services portfolio is offered when working with shale-oil reservoirs, which includes specialized interpretation of geophysical and seismic data, geological and geomechanical modelling. Such an integrated approach results in building of Complex Earth Model (CEM) which serves as a basis for analysis and mapping of favourable areas, zones and intervals for well placement (identification), safe drilling and geo-navigation (accessing reserves), completion and reservoir stimulation with multi-stage hydraulic fracturing (producing hydrocarbons).